Azenco Galvanizing Plant in Azerbaijan

Together with our partner KVK Koerner, who was the general contractor for this project, we succeeded in the year 2010 in an interesting and very exciting project, the construction of a new galvanizing plant in Baku, Azerbaijan. Why was it exciting? For us, it was a new and up to this point unknown world.

And even for our customer Azenco, it was an exciting and courageous step, as it is the very first galvanizing plant ever built in Azerbaijan. It was built in the Sumgait Technology Park, in which other metal processing companies have also recently settled. Azenco invested in modern technology to a western standard, this means encapsulated pre-treatment from KVK Koerner and fully automatic Scheffer-Transportation Technology compliant with the proven and standardized Scheffer principle, with distribution crane, drive units on a monorail and direction change via turn tables. With a transport load bearing capacity of 2 x 6.3 tons, components with maximum dimensions of 15,000 x 1,600 x 2,900 mm can be transported and galvanized.

Technical Guide

Kettle dimensions 15,5 m x 1,8 m x 3,2 m
Dips per hour 4
System load-bearing capacity 2 x 6.300 kg
Main components
  • 1 distribution crane

  • 9 lifting and lowering stations

  • 5 drive units • 10 turntables

  • approx. 315 m monorail system

azenco1 azenco2 azenco3 azenco4